Below Ground Tanking Systems – Projects

Project: Ardmore Road. Herne Bay

Contractor: Cameron Ireland Builders Ltd

Work Completed: Full Villa Rebuild. Tanking under slab and foundation walls using Nuralite 3PT/3PTM Single Layer Membrane

  • Single Layer 3PT/3PTM membrane is applied to timber framing

Project: Fairway Gardens Retirement Village

Contractor: New Zealand Strong

Work Completed: Newbuild. Tanking to swimming pool area using Nuraply 3PTM to underslab applied over 100mm Nuratherm underfloor insulation boards.  Nuraply 3PT to foundation walls with Nuradrain protection board to the retaining walls.  100mm Nuratherm underfloor insulation boards


Project: Hackett Street, Saint Marys Bay

Contractor: Cameron Ireland Builders Ltd

Work Completed: Full Villa Rebuild. Tanking of dug out villa basement using Preprufe 300 R to Underslab and basement retaining walls

  • Preprufe mebrane is applied to the footings and temporary timber wall framing in preparation for Shockcrete to be sprayed on